1.) Demolition existing master bath down to the stud-walls 2.) Insure stud walls are straight, square, plumb 3.) Add framing for toilet-tank in-wall 4.) Expand electrical for that vanity area has 4 GFI plugs as well as switches for light, and separate switch for fan w/ light Etc.
评论