





——
A 3D model of a Wall Lamp, featuring matte gray circular panels and a sleek black central strip, with a minimalist and contemporary aesthetic. It has a low polygon count and is suitable for indoor wall decoration and ambient lighting.
ID:53606272
Category:Lighting
Size:20.2698 x 4.96575 x 23.0728 cm
Texture:——
Color:Gray
Style:Swedish
Brand:PIER
Similar model recommendations

This modern minimalist wall lamp features a sleek white finish with a subtle black accent and 84 polygons, ideal for hallways, living rooms, or bedrooms.

A modern wall lamp designed with a black stem, gold accents, and a striking white faceted geometric shade, suitable for various interiors, featuring 6738 polygons.

This artistic wall lamp features opalescent glass resembling a shell, with visible brass hardware and 3552 polygons, ideal for modern decor.

A 3D model of a Wall Lamp, featuring a sleek, metallic gold finish with a minimalist, elongated design and a modern minimalist aesthetic. It has smooth surfaces and clean lines, suitable for indoor lighting in bedrooms, bathrooms, or hallways.
Product recommendations

HANABASS Wall Mounted Metal Flower Vase Set 2Pcs Black Wall Flower Tube Holders for Dried Flowers and Greenery Minimalist Plant Holder for Home Office Kitchen Decor

Bedside LED Kids Room Wall Lamp Minimalist LivingRoom Background Decoration Colorful Children's Lighting ,Porch

EZVALO Picture Light for Wall, 4800mAh Rechargeable Wireless Remote Lights, 16'' Dimmable Magnetic LED Art Painting Light with 3 Color Temps, Display for Gallery, Living Room, Bedroom, Hallway (Gold)

Wireless Picture Lights for Wall Battery Operated Brass Art Light for Paintings with Remote 3CCT Dimmable Potrait Lighting Rotatable Display Lighting 16" Rechargeable Wall Lamp for Frame Dartboard

Children's Bedroom Beside LED Wall Lamps Home Creative Astronaut Boy Walkway Style Decor for Living Room Hotel Bright Lustre,Simple

Recessed Lighting Linear LED Wall Sconce Long Strip Wall Light Minimalist Indoor Wall Mount Lamp Hallway Lighting Fixture Bar for Bathroom Living Room Bedroom Bedside Kitchen Staircase(Gold,40cm/15.7i

Children's Room Wall Lamp Creative Living Background Stair Corridor LED Astronaut Moon Bedroom Bedside,Contemporary Wall Lamps














